We are back at the Hinkley Point C site following a break of around 18 months. This time we are modifying the tunnel arisings from the TBM boring the water coolant tunnels out into the Bristol Channel. The material, once treated, is then used as fill around the massive site.
GE Awards 2020
Congratulations to Steve Dunn a member of the winning team who won the Editors Award…
Read More