Read MoreUpgrade of existing road network junctions at Worsley in the city of Salford while always keeping junction open to live traffic.
AEY were engaged at an early stage before construction to advise on the buildability of the scheme. We were then able to secure the construction phase on this basis.
The importance of the A580 East Lancashire Road corridor for general traffic has been recognised and the scheme will improve junction efficiency and capacity, along with a safer walking environment with new footways and controlled crossings. The scheme also enhanced bus-stop facilities and provided enhanced uncontrolled pedestrian and cycling crossing points.
The works within this scheme will include but are not limited to the following:
• Stop lines repositioned to improve capacity.
• New traffic signal arrangements and timing review to improve efficiency.
• Improvements to controlled and uncontrolled crossing points.
• Carriageway widening to alleviate waiting traffic on Lancaster Road
• New footway construction and surfacing.
• Bus stop enhancements to improve accessibility.
• Carriageway resurfacing, including skid resistance application.

We were contracted by Amco Giffin to successfully deliver a grounds work package to Leeds…
Read More
A E Yates Ltd successfully delivered the strengthening and refurbishment of the Grade II‑listed Derby…
Read More
Harworth Estates were proposing to regenerate the former Thoresby Colliery site in Nottinghamshire to develop…
Read More
This scheme was successfully delivered through our Highways Capital Works Framework with Warrington Council using…
Read More