Logistics North Development, Phases 1 – 4, Bolton
Infrastructure works for a major new logistics park and environmental reserve on a disused open-cast…
Read MoreMajor repair and maintenance works to a Grade 1 Listed Structure
Repairs to an 8 arch masonry single lane traffic signal controlled bridge over the River Dee on the English / Welsh border, and a Grade 1 Scheduled Monument. Works included; extensive masonry repairs, new concrete deck and waterproofing, alterations to drainage, new traffic signals, renew cast iron kerbs, resurfacing of carriageway, footways and refuges. TM and diversions. Extensive local PR liaison with the travelling public and the Farndon and Holt communities on either side of the bridge during the bridge closure, whilst maintaining pedestrian access throughout the bulk of the works. (NEC/ECC Option B)
Infrastructure works for a major new logistics park and environmental reserve on a disused open-cast…
Read MoreRoyal Horticultural Society (RHS) Bridgewater project, Worsley, Salford
Read MoreBridge maintenance works
Read More