Case Study

Farndon – Holt Bridge Repairs Cheshire

Major repair and maintenance works to a Grade 1 Listed Structure

Client
Cheshire West & Chester
Value
£331k
Contract No.
C997

Overview

Farndon - Holt Bridge Repairs, Cheshire

Repairs to an 8 arch masonry single lane traffic signal controlled bridge over the River Dee on the English / Welsh border, and a Grade 1 Scheduled Monument. Works included; extensive masonry repairs, new concrete deck and waterproofing, alterations to drainage, new traffic signals, renew cast iron kerbs, resurfacing of carriageway, footways and refuges. TM and diversions. Extensive local PR liaison with the travelling public and the Farndon and Holt communities on either side of the bridge during the bridge closure, whilst maintaining pedestrian access throughout the bulk of the works. (NEC/ECC Option B)