Blackburn Town Centre UID’s, Blackburn
The project objective was to resolve five unsatisfactory intermittent discharges (UID's) into the River Blakewater
Read MoreMajor repair and maintenance works to a Grade 1 Listed Structure
Repairs to an 8 arch masonry single lane traffic signal controlled bridge over the River Dee on the English / Welsh border, and a Grade 1 Scheduled Monument. Works included; extensive masonry repairs, new concrete deck and waterproofing, alterations to drainage, new traffic signals, renew cast iron kerbs, resurfacing of carriageway, footways and refuges. TM and diversions. Extensive local PR liaison with the travelling public and the Farndon and Holt communities on either side of the bridge during the bridge closure, whilst maintaining pedestrian access throughout the bulk of the works. (NEC/ECC Option B)
The project objective was to resolve five unsatisfactory intermittent discharges (UID's) into the River Blakewater
Read MoreProject to improve unsatisfactory intermittent discharges to local watercourses at two locations in Warrington.
Read MoreWidening of the existing footways including large areas of surfacing to improve the difficulties experienced…
Read MoreMajor repair and maintenance works to a Grade 1 Listed Structure.
Read More