Case Study

Heineken Hereford

Commercial Development

Process
35te Kobelco SK350 / MG90 Grizzly SideGrip / 700N Air Hammer / Augertorque E50000 Earth Drill
Client
Barhale Ltd
Contract No.
C21314

Overview

Heineken Hereford

SPI Piling Ltd was employed to install a 4 sided cofferdam with 10.0m sheet piles using the excavator and grizzly hammer.
One side of the cofferdam was obstructed at 5.5m above the platform level by a duct bridge, which will remain in place for the duration of the installation works.
On this side the sheet piles were cut in half and structurally re-welded in-situ.

Equipment used for this project was:-

35te Kobelco SK350
MG90 Gilbert Grizzly Side Grip
700N Air Hammer
Augertorque E50000 Earth Drill