Blackburn Town Centre UID’s, Blackburn
The project objective was to resolve five unsatisfactory intermittent discharges (UID's) into the River Blakewater
Read MoreProject to improve unsatisfactory intermittent discharges to local watercourses at two locations in Warrington.
WAR0014 - Orford: Transfer pipework from the existing modified CSO chamber, feeding a 1980m3 detention tank as 15m ID 20m deep segmental shaft in varied and poor ground conditions, with pumped return of flows back to the sewer network in Orford Park. WAR0018 Houghton Green: 150mm to 1350mm diameter sewer, 1200 to 2700mm Manholes, 50m Long access road, Ultrasonic level monitors, control kiosk & associated building services complete with cabling. (UU CD 100)
The project objective was to resolve five unsatisfactory intermittent discharges (UID's) into the River Blakewater
Read MoreWidening of the existing footways including large areas of surfacing to improve the difficulties experienced…
Read MoreMajor repair and maintenance works to a Grade 1 Listed Structure.
Read MoreD&C Section 278 & 38 highway and infrastructure works for a new Care Home under…
Read More