Development Infrastructure

A E Yates have a number of projects where we have majorly reconstructed road surfaces on motorways, retail parks and industrial developments.

Development Infrastructure projects:

A595 Moresby Hall scheme, Cumbria

  • Client: National Highways

A E Yates completed this major redevelopment infrastructure project at the end of 2023. In total, we had 175 staff working over each of the ten weekends and with their hard work we constructed two new drainage tunnels under the A595 and we built two large ponds to collect any drainage water; this will prevent flooding in the area. We finalised work on two new drainage tunnels under the A595 and increased the length of the merge lane off Howgate roundabout whereby we installed 3.9km of new kerbs and kerb drainage along the A595 and 500 metres of new gas pipelines and BT fibre-optic cabling. On this project A E Yates resurfaced over a mile of carriageway!

Thoresby Vale, Edwinstowe, Nottinghamshire

  • Client: Harworth

A E Yates are currently undertaking Phase 2 enabling works including demolition, reclamation, remediation, earthworks and infrastructure works. We have demolished the existing vehicular bridges, footbridges and abutments. Earthworks that we are currently undertaking: Drainage (including forming new attenuation ponds and a Cat Moat); Highways – Construction of the Section 38 spine road and footpaths; Installation of new utilities mains to serve the development; and both hard and soft landscaping works

Logistics North, Bolton

  • Client: Harworth

A E Yates constructed new highways, associated landscaping, foul and surface water drainage, street lighting, SUDS ponds and swales and new incoming utility supplies. The construction of a country park including paths and bridleways, viewing platforms and lakes was also completed.

RHS Garden Bridgewater, Worsley, Salford

  • Client: Royal Horticultural Society

The project consisted of site preparation through strip of topsoil and storage for RHS future use, strip of sub-soils, the creation of bunds and site levelling. Ground stabilisation and construction of new access roads within the site, car parking and associated hard and soft landscaping. We created surface water attenuation within the car park build-up and a bio-retention and attenuation lake, and construction of swales. External lighting for the car park and access roads was installed as well as services infrastructure including power, communications, water and gas. A E Yates also constructed the Horticultural Services Yard agricultural building, bulk storage, fencing, drainage and MEP services.