
Blackburn Town Centre UID’s, Blackburn
The project objective was to resolve five unsatisfactory intermittent discharges (UID's) into the River Blakewater
Read MoreBridge maintenance works
Works order through our Bridge Maintenance Framework with Leeds City Council. Refurbishment works to a Footbridge over the River Aire in a conservation area. Works included; Preparation and painting to Ironwork, Concrete Deck Repairs, Deck Waterproofing, Relay conservation setts & kerbs, Surfacing, Extensive PR liaison with local residents adjacent to the works and bridge users. Ongoing liaison with the EA. (ICE 7th)

The project objective was to resolve five unsatisfactory intermittent discharges (UID's) into the River Blakewater
Read More
Project to improve unsatisfactory intermittent discharges to local watercourses at two locations in Warrington.
Read More
Widening of the existing footways including large areas of surfacing to improve the difficulties experienced…
Read More
Major repair and maintenance works to a Grade 1 Listed Structure.
Read More