Blackburn Town Centre UID’s, Blackburn
The project objective was to resolve five unsatisfactory intermittent discharges (UID's) into the River Blakewater
Read MoreConstruction of an additional surface car park (approx. 575 spaces) over two levels on brown-field land adjacent to a busy shopping centre.
Widening of existing access roadway, bulk earthworks, drainage, carriageway construction, construction of PCC culverted watercourse, new access roadway, surfacing and block paving, installation of 2m high perimeter fencing, installation of enhanced lighting, repositioning of Car Park 5 entrance and exits, alteration to pedestrian route through car park 8, including RC steps and handrails, minor alterations / improvements to Bus Station. (JCT D&B 2011)
The project objective was to resolve five unsatisfactory intermittent discharges (UID's) into the River Blakewater
Read MoreProject to improve unsatisfactory intermittent discharges to local watercourses at two locations in Warrington.
Read MoreResurfacing and reconstruction of the busy A590 off the M6 near Kendal.
Read MoreReconstruction & widening of a partially collapsed double arch masonry road bridge over the River…